Recent Case Studies

Our kitchen extraction systems are widely used in the Education, Healthcare and Hospitality industries. In a typical year we install systems in over 70 schools and colleges, 60 care homes and hospitals, and 120 hotels, pubs, restaurants and takeaways.

In addition we work in countless offices, factories, churches and military bases.

For fast and professional advice, a free site survey or estimate call us NOW on 0117 963 4492 or email us.

Hatherley Manor

St Katherine’s School

Four large, spigot-only canopies ranged over two floors of this new-build project near Bristol gave us plenty of challenges.

View >
Hatherley Manor

Hatherley Manor Hotel

The 50 room, 3 star, Hatherley Manor Hotel and Conference Centre enjoys a rural Gloucestershire setting but when the time came to refurbish the extensive kitchens they didn’t do it by halves!

View >
Madew By Bob

Made By Bob, Cirencester

The concept for the public areas of this wonderful restaurant/bar/delicatessen was built around the central island canopy and cooking suite. This meant that the extraction system had to be both highly efficient and striking in appearance.

View >
Nationwide HQ

Nationwide Building Society HQ

3,400 people a day use the staff restaurant at Nationwide Building Society’s Lakeside headquarters and BWF had just five days to complete a major installation.

View >
Oakfields School

Oakfields School, Frome

The reinstatement of the kitchen called for new equipment and a new extraction system with replacement air, canopy lighting, wall cladding and gas interlock with plant located on the flat roof above

View >
Weston Park

Weston Park, Nr Telford

Set in the extensive grounds of Weston Park, the new Granary Restaurant required four extraction canopies. The system design had to allow for the constraints of the historic building structure and the sensitive, rural location.

View >
Paxhill image

Paxhill Nursing Home

During 2009 a brand new care home was built in the grounds of Pax Hill originally owned by Lord Baden-Powell. BWF worked with HCE to design the island canopy and service spine and to install extract and replacement air ductwork up a service shaft to plant mounted on the roof three floors above.

View >

 

^ Top | << Back