| Four large, spigot-only canopies ranged over two floors of this new-build project near Bristol gave us plenty of challenges. The low ceiling heights threatened to restrict airflows and led to extensive redesign work with the M&E consultants and ductwork contractors, access difficulties saw us posting a large canopy through a first floor window via long-reach forklift, and canopy damage by other trades after installation required specialist in situ remediation. We worked with our partners, the ABM Group, and the main contractor, Wilmott Dixon, to effectively overcome all of these issues and the results are a credit to all concerned.
For fast and professional advice, a free site survey or estimate call us NOW on 0117 963 4492 or email us. ^ Top | << Back |